New build electrical planning: a room-by-room guide

How to plan the electrical in a new NZ home: switchboard and circuits, power points, RCDs, lighting, EV charging, data and a room-by-room checklist.

By Plexus ElectricalPublished Updated 7 min read

The time to plan the electrical in a new home is the design stage, before the plans are signed off, because that is when the switchboard location, circuit layout, power point and lighting positions, and cable routes for data, security and EV charging cost the least to get right. Good planning means a layout drawn around how you will live in the house, a switchboard sized for future loads, and prewiring for the things you might add later. Heating and cooling belongs in the same plan, because it affects the board and the ceiling space. This guide walks through what to decide, in roughly the order you need to decide it.

Start early and coordinate with other trades

Level (BRANZ) puts it simply: "Coordination of installation with other trades is essential before the prewire starts." In a new build the electrician's work overlaps with the builder, plumber, kitchen designer, data installer and heating and cooling installer. A clash found on paper costs nothing to fix. The same clash found after the linings are up means cutting plasterboard.

A typical sequence looks like this:

  1. Design: electrical layout, lighting plan, switchboard and meter location, and the positions of fixed appliances such as the oven, hob and any heat pumps.
  2. Temporary power: Level notes that "before construction starts, temporary power must be installed to the site."
  3. Prewire (rough-in): cables, ducting and conduits run while the framing is open.
  4. Fit-off: switches, sockets, lights and appliances connected after linings and painting.
  5. Testing and certification, before the code compliance certificate application.

Plexus produces its own electrical plans as part of our electrical design service, and our design and build service is available beyond Auckland.

Meter box and switchboard

Level (BRANZ) gives practical guidance for both:

  • Meter box: locate it for easy access and a short mains cable route, flash it properly where it passes through cladding, and in coastal areas choose PVC-U, fibreglass or stainless steel.
  • Switchboard (distribution board): size it "to cope with maximum demand and include allowance for future demand". Locate it centrally, close to high-demand areas such as the kitchen, where it is accessible, dry and well ventilated, between 1.2 m and 2.9 m above floor level. Avoid placing it under the stairs.
  • Sub-boards suit garages, studios and areas that are hard to reach from the main board.

Leave real spare capacity. Homes often add circuits over time: a spa pool, a sleepout, an EV charger, another heat pump.

Circuits, power points and RCD protection

Once the board position is set, the circuit layout follows from how each room will be used.

  • Power points. Plan them from the furniture layout and what you will plug in where: bench runs, bedsides, the TV wall and the home office. Our guide to how many power points you need and where goes room by room.
  • Dedicated circuits. Level (BRANZ) describes dedicated circuits for wall ovens, hobs, heat pumps and underfloor heating, and for any permanently connected appliance rated over 10 A. The appliance manufacturer's installation instructions set the circuit rating.
  • RCD protection. Level (BRANZ) states that "all new lighting and power outlet circuits installed in electrical installations must be protected by one or more RCDs" (this does not apply to permanently connected appliances). How the circuits are split across RCDs decides how much of the house goes off if one trips. See RCD protection explained.
  • Maximum demand. Every fixed load, from the cooktop to an EV charger and heat pumps, goes into the maximum demand calculation that sizes the board and the supply.

Lighting

Draw the lighting plan alongside the power layout: switch positions at each doorway you actually walk through, switching from both ends of stairs and long hallways, dimmers where you want them, and outdoor lighting on sensors or timers. Our home lighting design guide covers layers, light levels and switching in more detail.

EV charging

Level (BRANZ) notes that "electric car charging at home is likely to become more common in future", and that charging outlets "should be supplied by a dedicated final subcircuit and have a minimum rating of 20 A." EECA adds that a 32 A circuit future-proofs a wall charger install. Even if you do not own an EV, running a suitable cable to the garage or parking space during the build is far cheaper than retrofitting it. Our EV charger cost guide covers what goes into the install itself.

Data, security and smart home cabling

Level (BRANZ) advises that cabling for controlled gates, intercoms and security cameras can usually go in the mains trench, so it should be planned early, and that if these are planned for later, "the prewiring should be carried out during the initial installation." It also recommends considering "additional conduits or draw wires to roof, wall and underfloor spaces."

For most new homes that means deciding now on:

  • network data points in the living areas, office and bedrooms, and a central location for the network equipment (data and network cabling);
  • camera positions and an alarm panel location (home security options);
  • an intercom at the gate or front door;
  • any smart home lighting or heating control.

Smoke alarms

Level (BRANZ) notes that smoke alarms are mandatory in new residential work, that the Acceptable Solutions call for interconnected alarms installed to NZS 4514:2021, and that "installing or replacing a hard-wired alarm must be done by a licensed electrician." Plan their positions on the lighting plan so they do not clash with downlights, ceiling vents or heat pump airflow. Our guide to hard-wired smoke alarms explains the options.

Heating and cooling: plan it with the electrical

Decide the heating and cooling system before the prewire, because it affects the switchboard, the ceiling space and the wall layout. On the electrical side, each heat pump needs a circuit sized to the manufacturer's installation requirements, an outdoor unit position with its own supply, and its load included in the maximum demand calculation. A ducted system also needs ceiling (or underfloor) space for the indoor unit and ducts, and positions for the outlets, return-air grille, wall controller and any zone sensors. High-wall units need a wall position in each room and a route for pipework and the condensate drain.

A heat pump's heating capacity (kW of heat) is not its electrical input (kW of electricity), so the heating size alone does not tell you the circuit size. Our whole-home heat pump calculator gives a preliminary system size, and ducted vs high-wall heat pumps compares the two main options for a new home. Because Plexus also installs heating and cooling, the heat pump circuits can be drawn on the same electrical plan as everything else.

Room-by-room checklist

Room Things to decide
Kitchen Socket positions on every bench run, appliance circuits (oven, cooktop, dishwasher, fridge), rangehood, under-cabinet lighting, island power
Living Socket and data positions around the likely TV and furniture layout, dimmable lighting, heating unit or outlet and controller positions
Bedrooms Bedside sockets and switches, USB outlets if wanted, heating unit or outlet position, data point in the office or study
Bathrooms Extract fan ducted outside, heated towel rail, lighting and mirror lighting, underfloor heating if planned
Laundry Washer and dryer sockets, extract fan, lighting
Garage EV charger circuit or cable, door motor, workbench sockets, network equipment if located there
Outdoors Exterior lighting on sensors or timers, weatherproof sockets, gate and intercom cabling, camera positions, heat pump outdoor unit positions

Labelling, records and certification

Level (BRANZ) recommends clear labelling of every circuit at the board, as-built drawings showing circuits and concealed cable locations, and a photographic record of cable locations taken during installation. Ask for these. They make every future job easier.

On consented work, section 92 of the Building Act 2004 requires the owner to include any energy work certificate for the energy work with the application for a code compliance certificate. Prescribed electrical work is energy work under the Act, so your electrician's certification is part of getting the house signed off. Our guide to electrical certificates (CoC and ESC) explains what you should receive, and our testing and certification page covers the testing behind it.

Next steps

Plexus has done electrical design and installation on multi-dwelling developments as well as individual homes, including the heating and cooling sizing calculations. Read about our new build electrical service, or if you are a developer see builders and developers. When your plans are ready for an electrical layout, request a quote.

Sources

  1. Level (BRANZ): Internal electrical power services
  2. Level (BRANZ): Electrical design
  3. Level (BRANZ): Wiring
  4. Level (BRANZ): Fixed wiring for electrical systems and appliances
  5. Level (BRANZ): Additional on-site electrical demand
  6. EECA: Charging your EV
  7. Building Act 2004, section 92 (application for code compliance certificate)

This guide is general information for New Zealand homes, not advice for your specific property. For a recommendation that accounts for your house, ask us.

FAQ

Frequently asked questions

When should I involve an electrician in a new build?

At the design stage, before the plans are finalised. Switchboard and meter location, the circuit layout, power point and lighting positions, and cable routes for data and security are much easier to get right on paper than on site. Level (BRANZ) also notes that coordination with other trades is essential before the prewire starts.

Do all circuits in a new house need RCD protection?

Level (BRANZ) states that all new lighting and power outlet circuits must be protected by one or more RCDs. This does not apply to permanently connected appliances. How the circuits are split across RCDs is a design decision worth discussing with your electrician.

Should I prewire for an EV charger even if I do not own an EV?

It is worth considering. Level (BRANZ) notes that home EV charging is likely to become more common and that charging outlets should be on a dedicated final subcircuit. Running the cable during the build, when the walls are open, costs far less than retrofitting it later.

Where should the switchboard go in a new house?

Level (BRANZ) recommends a central location close to high-demand areas such as the kitchen, accessible, dry and well ventilated, mounted between 1.2 m and 2.9 m above floor level, and not under the stairs.

Do I need hard-wired smoke alarms in a new build?

Level (BRANZ) notes that smoke alarms are mandatory in new residential work, that the Acceptable Solutions call for interconnected alarms, and that mains-powered alarms with battery backup are more reliable. Installing a hard-wired alarm must be done by a licensed electrician.