Skip to content
Plexus Electrical

New builds

Wire the house you will actually live in, not the one on the standard plan

The cheapest time to put a power point, data cable or extra light in the right place is before the linings go on. Plexus plans the electrical for new homes and multi-unit developments with you and your builder, sets up the temporary supply, pre-wires the frame and fits off at the end. Lighting, power, data, EV charging and the switchboard are planned together in one layout.

Timber-framed new build with electrical cables pre-wired through the ceiling joists and wall framing

Pre-wire stage: cables run through the frame before the ceilings and walls are lined.

Electrical plans, builder's temporary supply, pre-wire and fit-off for new homes, with lighting, data and EV charging planned in.

Building a new home or development?

From plans to power on

Every build is different, but the electrical usually follows this order.

  1. STEP 01

    Electrical plan

    We mark up lighting, switching, power, data and heating and cooling positions on your plans, or draw a full electrical plan through our electrical design service.

  2. STEP 02

    Temporary builder's supply

    A temporary supply so the builder has safe power on site from the early stages of the build.

  3. STEP 03

    Pre-wire

    Once the frame is up and the roof is on, we run cables for every light, switch, power point and appliance, plus data, any security or automation cabling, and the supply for an EV charger or heat pump.

  4. STEP 04

    Fit-off

    After the linings and painting, we fit switches, outlets, light fittings and the switchboard, and connect appliances.

  5. STEP 05

    Test, liven and certify

    The installation is tested and livened, and you receive the certificates the work requires for your records.

Decide these before the pre-wire

Changes after the walls are lined cost more and look worse. Walk through each room with these in mind.

  • Where the beds, sofas, TV and desk will actually go, so power and data land beside them rather than behind them.
  • Kitchen appliances: oven, cooktop, rangehood, dishwasher, fridge, and any appliances that need their own circuit.
  • Lighting layers in living areas and the kitchen, and which lights you want dimmable.
  • Two-way and three-way switching at each end of hallways and stairs, and at the doors you actually use.
  • Outdoor lighting, outdoor power and garden circuits.
  • An EV charger in the garage, or at least a cable run and switchboard space ready for one.
  • Data points, the router location and where security cameras, an alarm keypad or intercom will go.
  • Heat pump or ducted system positions, controller location and isolator positions.

New build timeline

Where the electrical fits in the build

Cables go into the frame before the council's pre-line inspection and before the walls and ceilings are lined. Switches, outlets, light fittings and the switchboard are fitted off once the linings are up and painted.

That is why positions need to be settled before the pre-wire: moving a cable after the linings are on means cutting and patching. At the end, the installation is tested before it is livened, and certified with a Certificate of Compliance and an Electrical Safety Certificate.

BEFORE LININGS: CABLE GOES IN01DESIGNLights, power, datamarked on the plans02TEMP SUPPLYBuilder's poweron site03PRE-WIRECables run throughthe frame04PRE-LINECouncil inspectionbefore liningsCHANGES COST MORE FROM HERE05LININGSWalls and ceilingsclosed inAFTER LININGS: FITTINGS GO ON06FIT-OFFSwitches, outlets,lights and board07TEST + CERTIFYTested, livened,CoC and ESC08HANDOVERCertificates foryour recordsELECTRICIANBUILDERCOUNCILORDER VARIES

Heating and cooling

Electrical, heating and cooling in one plan

On a new build, a ducted heat pump needs ceiling space for the indoor unit and duct runs, a position for the outdoor unit, a controller location and a dedicated circuit from the switchboard. Those decisions affect the electrical layout, the framing and the switchboard size.

When separate contractors handle electrical and HVAC, these details often get resolved on site, late. We size the system, plan the duct runs and design the electrical together, and we have done exactly that on multi-dwelling developments. See ducted air conditioning and our projects.

Ducted heat pump ductwork roughed in through the ceiling framing of a new build

Who decides what on a new build

A rough guide to who usually owns each decision. It varies by contract, so confirm with your builder.

ItemUsually decided byWhere Plexus helps
Lighting and power positionsOwner, with designer or architectMarking up or drawing the electrical plan
Light fittings and switch stylesOwnerAdvice on fittings that suit the ceiling, insulation and dimming
Appliance scheduleOwner and kitchen designerCircuits and isolation for each appliance
Switchboard size and locationElectricianAllowing spare capacity for EV charging or future circuits
Temporary supplyBuilderSupply, setup and removal
Heating and cooling systemOwnerSizing, system choice and the matching electrical

Ngaiwi Apartments, Ōrākei

Pre-line on a multi-unit build

FAQ

New builds: common questions

When should I get an electrician involved in a new build?

As early as the plans are reasonably settled. That gives time to agree lighting and power positions, size the switchboard and plan heating and cooling before the frame goes up, rather than solving it on site.

Can you work with my builder's existing plans?

Yes. We can price from the architect's or designer's electrical layout, mark up changes, or produce a full electrical plan if there is not one. See electrical design.

Do you supply the temporary builder's supply?

Yes. We set up the temporary supply for the build and remove it when the permanent supply is connected.

Should I pre-wire for an EV charger even if I do not have an EV yet?

It is worth considering. Running a suitable cable to the garage and leaving space on the switchboard during the build costs far less than retrofitting later. See EV charger installation.

Can you install the heat pump or ducted system as well?

Yes. One team sizes the system, roughs in the ductwork and pipework, and does the electrical, so there is no gap between trades. Try our whole-home heat pump calculator for a first estimate of the size you need.

What certificates do I get at the end?

New wiring is certified with a Certificate of Compliance, and an Electrical Safety Certificate is issued once the installation is connected. Keep copies with your build documents. See testing and certification.

Do you work on multi-unit developments?

Yes. We have done electrical design, HVAC sizing and installation on multi-dwelling developments including Walker Road, Podgora and Agincourt. Developers should also see our page for builders and developers.

What customers say

5.0 from 47 Google reviews

Customer reviews

“Ryan and his team are absolutely fantastic: professional, punctual, with clear quotes and excellent communication. They offer both renovation and upgrade services for existing homes, as well as wiring and installations for new builds. I’m extremely satisfied with the upgrade they did for my home. A 5-star recommendation!”

Bo A. / Home upgrade / Google review

“We’ve been working with Ryan and his team at Plexus Electrical since 2016, and we can’t recommend him highly enough. Over the years, Ryan has consistently delivered exceptional service for our projects. He’s reliable, professional, and always brings a high level of expertise to every job. Whether it’s been smaller jobs or more complex work, he approaches everything with care and precision. It’s amazing having someone like Ryan as part of our trusted team. A true professional and a pleasure to work with!”

Saleem B. / Client since 2016 / Google review

“Excellent company, great communication and exceptional results. Great job with the design and lovely people to work with. Highly recommend them.”

Glen M. / Design and installation / Google review

Building a new home or development?

Send us the plans and the build programme, and tell us whether you want heating and cooling included.

Call 021 210 5934Request a quote