New builds
Wire the house you will actually live in, not the one on the standard plan
The cheapest time to put a power point, data cable or extra light in the right place is before the linings go on. Plexus plans the electrical for new homes and multi-unit developments with you and your builder, sets up the temporary supply, pre-wires the frame and fits off at the end. Lighting, power, data, EV charging and the switchboard are planned together in one layout.

Pre-wire stage: cables run through the frame before the ceilings and walls are lined.
Electrical plans, builder's temporary supply, pre-wire and fit-off for new homes, with lighting, data and EV charging planned in.
Building a new home or development?From plans to power on
Every build is different, but the electrical usually follows this order.
- STEP 01
Electrical plan
We mark up lighting, switching, power, data and heating and cooling positions on your plans, or draw a full electrical plan through our electrical design service.
- STEP 02
Temporary builder's supply
A temporary supply so the builder has safe power on site from the early stages of the build.
- STEP 03
Pre-wire
Once the frame is up and the roof is on, we run cables for every light, switch, power point and appliance, plus data, any security or automation cabling, and the supply for an EV charger or heat pump.
- STEP 04
Fit-off
After the linings and painting, we fit switches, outlets, light fittings and the switchboard, and connect appliances.
- STEP 05
Test, liven and certify
The installation is tested and livened, and you receive the certificates the work requires for your records.
Decide these before the pre-wire
Changes after the walls are lined cost more and look worse. Walk through each room with these in mind.
- Where the beds, sofas, TV and desk will actually go, so power and data land beside them rather than behind them.
- Kitchen appliances: oven, cooktop, rangehood, dishwasher, fridge, and any appliances that need their own circuit.
- Lighting layers in living areas and the kitchen, and which lights you want dimmable.
- Two-way and three-way switching at each end of hallways and stairs, and at the doors you actually use.
- Outdoor lighting, outdoor power and garden circuits.
- An EV charger in the garage, or at least a cable run and switchboard space ready for one.
- Data points, the router location and where security cameras, an alarm keypad or intercom will go.
- Heat pump or ducted system positions, controller location and isolator positions.
New build timeline
Where the electrical fits in the build
Cables go into the frame before the council's pre-line inspection and before the walls and ceilings are lined. Switches, outlets, light fittings and the switchboard are fitted off once the linings are up and painted.
That is why positions need to be settled before the pre-wire: moving a cable after the linings are on means cutting and patching. At the end, the installation is tested before it is livened, and certified with a Certificate of Compliance and an Electrical Safety Certificate.
Heating and cooling
Electrical, heating and cooling in one plan
On a new build, a ducted heat pump needs ceiling space for the indoor unit and duct runs, a position for the outdoor unit, a controller location and a dedicated circuit from the switchboard. Those decisions affect the electrical layout, the framing and the switchboard size.
When separate contractors handle electrical and HVAC, these details often get resolved on site, late. We size the system, plan the duct runs and design the electrical together, and we have done exactly that on multi-dwelling developments. See ducted air conditioning and our projects.

Who decides what on a new build
A rough guide to who usually owns each decision. It varies by contract, so confirm with your builder.
| Item | Usually decided by | Where Plexus helps |
|---|---|---|
| Lighting and power positions | Owner, with designer or architect | Marking up or drawing the electrical plan |
| Light fittings and switch styles | Owner | Advice on fittings that suit the ceiling, insulation and dimming |
| Appliance schedule | Owner and kitchen designer | Circuits and isolation for each appliance |
| Switchboard size and location | Electrician | Allowing spare capacity for EV charging or future circuits |
| Temporary supply | Builder | Supply, setup and removal |
| Heating and cooling system | Owner | Sizing, system choice and the matching electrical |
Ngaiwi Apartments, Ōrākei
Pre-line on a multi-unit build
FAQ
New builds: common questions
When should I get an electrician involved in a new build?
As early as the plans are reasonably settled. That gives time to agree lighting and power positions, size the switchboard and plan heating and cooling before the frame goes up, rather than solving it on site.
Can you work with my builder's existing plans?
Yes. We can price from the architect's or designer's electrical layout, mark up changes, or produce a full electrical plan if there is not one. See electrical design.
Do you supply the temporary builder's supply?
Yes. We set up the temporary supply for the build and remove it when the permanent supply is connected.
Should I pre-wire for an EV charger even if I do not have an EV yet?
It is worth considering. Running a suitable cable to the garage and leaving space on the switchboard during the build costs far less than retrofitting later. See EV charger installation.
Can you install the heat pump or ducted system as well?
Yes. One team sizes the system, roughs in the ductwork and pipework, and does the electrical, so there is no gap between trades. Try our whole-home heat pump calculator for a first estimate of the size you need.
What certificates do I get at the end?
New wiring is certified with a Certificate of Compliance, and an Electrical Safety Certificate is issued once the installation is connected. Keep copies with your build documents. See testing and certification.
Do you work on multi-unit developments?
Yes. We have done electrical design, HVAC sizing and installation on multi-dwelling developments including Walker Road, Podgora and Agincourt. Developers should also see our page for builders and developers.
What customers say
5.0 from 47 Google reviewsCustomer reviews
“Ryan and his team are absolutely fantastic: professional, punctual, with clear quotes and excellent communication. They offer both renovation and upgrade services for existing homes, as well as wiring and installations for new builds. I’m extremely satisfied with the upgrade they did for my home. A 5-star recommendation!”
“We’ve been working with Ryan and his team at Plexus Electrical since 2016, and we can’t recommend him highly enough. Over the years, Ryan has consistently delivered exceptional service for our projects. He’s reliable, professional, and always brings a high level of expertise to every job. Whether it’s been smaller jobs or more complex work, he approaches everything with care and precision. It’s amazing having someone like Ryan as part of our trusted team. A true professional and a pleasure to work with!”
“Excellent company, great communication and exceptional results. Great job with the design and lovely people to work with. Highly recommend them.”
Building a new home or development?
Send us the plans and the build programme, and tell us whether you want heating and cooling included.