Skip to content
Plexus Electrical

Builders, developers and architects

Two trades on your programme, one subcontractor to manage.

We price electrical and heating and cooling together from your plans, design them together, and install them to your build programme, from pre-line through to commissioning and handover.

Apartment at pre-line stage with electrical cabling in place, Ngaiwi Apartments, Ōrākei

On a project

How we fit into your programme

  1. STEP 01

    Pricing from plans

    Send architectural drawings and specifications. We price electrical and HVAC together, with assumptions stated.

  2. STEP 02

    Design

    Electrical layouts and heating and cooling loads, worked through with you and your architect before framing.

  3. STEP 03

    Pre-line

    Cabling, ductwork and pipework run before linings, coordinated so the trades do not clash in the ceiling space.

  4. STEP 04

    Fit-off

    Fittings, switchboards, indoor and outdoor units installed after linings and paint.

  5. STEP 05

    Test and commission

    Electrical testing and certification, then heat pump commissioning and zone checks.

  6. STEP 06

    Handover

    Certificates, manuals and a walk-through for the owner or property manager.

Send plans for pricing

Upload architectural plans and specifications (PDF or images, up to 20 MB in total) through the project enquiry form. We will come back with questions or a price.

Start a project enquiry

FAQ

Frequently asked questions

Can you price from plans only?

Yes. Send the architectural drawings and any electrical or mechanical specification. We will state our assumptions and confirm anything that needs a site visit.

Do you work with our architect or designer?

Yes. Electrical layouts and heating and cooling choices affect ceiling space, bulkheads, joinery and lighting design, so we prefer to be involved early.

Can you handle both the electrical and the heat pumps on our development?

That is the point of one team. It removes a coordination layer and means circuits, isolators and switchboard capacity are planned with the HVAC.

Do you provide documentation for code compliance?

Electrical certification is provided as the regulations require, along with commissioning records and manuals for the heating and cooling systems.

Call 021 210 5934Request a quote