An electrical plan drawn by the people who will wire it

Most electrical problems in new homes start on paper: a light switch behind a door, no power where the bed goes, a switchboard with no room left for an EV charger. Plexus draws its own electrical plans for new builds, renovations and multi-unit developments, covering lighting, power, switching, data and energy-efficient layouts, then installs them. The plan you sign off is the plan that gets built.

Residential electrical lighting plan showing light positions, two-way and three-way switching, and heat pump and return-air grille locations

Electrical plan prepared by Plexus Electrical

Electrical plans for new homes, renovations and developments: lighting, power, switching, data and heating, then built by the team that drew them.

Start your electrical plan

Why design first

What a proper electrical plan saves you

A standard builder's allowance is a count of lights and power points. It does not say where they go, how they are switched, which ones dim, or how the heating and cooling ties in. Those details get decided on site, quickly, often by whoever is standing in the room at the time.

An electrical plan settles all of it in advance. You see every light, switch, outlet and data point on your floor plan, with mounting heights and notes for anything unusual. Your builder can price it accurately, the electricians know exactly what to install, and you avoid the cost of changes after the linings are up.

Design to handover

Where the plan fits in the build

The electrical plan is the first stage. It is settled before the pre-wire, so the cables go into the frame in the right places the first time.

From there the plan guides each stage: the pre-wire, the fit-off once the linings are up, then testing and certification. Changes are easy on paper and cost more once the walls and ceilings are lined.

BEFORE LININGS: CABLE GOES IN01DESIGNLights, power, datamarked on the plans02TEMP SUPPLYBuilder's poweron site03PRE-WIRECables run throughthe frame04PRE-LINECouncil inspectionbefore liningsCHANGES COST MORE FROM HERE05LININGSWalls and ceilingsclosed inAFTER LININGS: FITTINGS GO ON06FIT-OFFSwitches, outlets,lights and board07TEST + CERTIFYTested, livened,CoC and ESC08HANDOVERCertificates foryour recordsELECTRICIANBUILDERCOUNCILORDER VARIES

What the design covers

01

Lighting

Layers of general, task and feature lighting for each room, chosen fittings, and which circuits are dimmable. More on lighting design.

02

Switching

Switch positions at the doors you use, two-way and three-way switching on stairs and long hallways, and sensible grouping so a panel of switches makes sense.

03

Power

Outlets placed around furniture and benchtops, USB outlets where wanted, and dedicated circuits for ovens, cooktops and other large appliances.

04

Data and AV

Data points, the router and comms location, TV positions and cabling for cameras, alarm and intercom. See data and network cabling.

05

Switchboard and capacity

A switchboard sized for the house, with spare capacity for an EV charger or future circuits. See switchboard upgrades.

06

Heating and cooling

Heat pump and ducted system positions, return-air grilles, controllers and the circuits to feed them, sized by the same team. See ducted air conditioning.

Power and data, positioned around how you live

This plan shows the level of detail we work to. Each outlet is marked with its type, entertainment points have their mounting height noted, appliance supplies are identified individually, and items still to be confirmed with the client are flagged so they are not forgotten on site.

Notes for future needs (a secondary router location, a potential shelving unit that affects lighting, a submain to a shed) are captured on the plan so the wiring allows for them now.

Residential power and data plan with socket-outlet, data and TV positions, mounting heights, appliance supplies and notes for a shed submain
Power and data plan for a residential project.

How design and build works

From plan to finished room

A short walk-through of how a Plexus electrical plan becomes the finished installation: the plan, the pre-wire, the heating and cooling rough-in and the fit-off.

An architectural floor plan appears. Electrical symbols for lights, power points, switches and data are placed room by room and connected into circuits back to the switchboard. The plan then turns into the finished, lit home.

Describe this animation

An architectural floor plan appears. Electrical symbols for lights, power points, switches and data are placed room by room and connected into circuits back to the switchboard. The plan then turns into the finished, lit home.

Energy-efficient layouts

Efficiency is mostly decided at the design stage, by what is installed and how it is controlled.

LED fittings chosen for the ceiling
EECA notes that for recessed downlights the biggest savings come from replacing the whole fitting rather than just the bulb, because of heat lost into the ceiling, and that most LEDs can be installed without gaps in the insulation around them (EECA). We specify fittings that suit the ceiling and insulation.
Control that matches use
Dimmers, sensors on outdoor and garage lighting, and switching that lets you light only the part of an open-plan space you are using.
Ready for an EV
A cable route and switchboard space for a future EV charger, with room for load management if the supply is tight.

The design and build process

  1. STEP 01

    Brief

    We go through your architectural plans and how you plan to use each room: furniture, appliances, heating and cooling, data and security.

  2. STEP 02

    First draft

    We draw the lighting, switching, power and data layout on your floor plans.

  3. STEP 03

    Review and revise

    You mark up changes. We revise until you are happy and the builder has what they need to price.

  4. STEP 04

    Build

    Our team pre-wires and fits off to the approved plan.

  5. STEP 05

    Handover

    The installation is tested and certified, and you keep the plan as a record of what is in your walls.

Design for multi-unit developments

On developments, the electrical design and the heating and cooling sizing have to work across every unit at once. Plexus has carried out electrical design, HVAC sizing calculations and installation on multi-dwelling developments including Walker Road in Point Chevalier, Podgora and Agincourt.

Developers and builders can find more on how we work on the builders and developers page.

Architectural render of a kitchen and dining area in the Walker Road development
Architectural render supplied by the developer

FAQ

Electrical design: common questions

Do I need an electrical plan if my architect has already drawn one?

Some architectural sets include a basic electrical layout. We can work from it, refine it, or check it against how you plan to use the house. Where there is no layout, or only a count of fittings, a full plan is worth doing.

Can you design the electrical for a house outside Auckland?

Yes. The design service is available throughout New Zealand. Installation is carried out by our team in Auckland; elsewhere, your local electrician can price and install from our plan.

Does the design include heating and cooling?

It can, and that is where design and build with Plexus is most useful. We size the heat pump or ducted system, show indoor units, grilles and controllers on the plan, and design the circuits to suit. See ducted air conditioning.

What do I need to give you to start?

Your floor plans (PDF is fine), elevations if you have them, a kitchen layout, and a rough idea of furniture positions and appliances. Tell us about any plans for an EV, security or automation.

Can I change things once the plan is signed off?

Yes, up to the pre-wire. Changes before the cables are run are simple. After the linings are up, they are slower and cost more, which is why we try to settle everything at the design stage.

Will the plan help my builder price the job?

Yes. A detailed plan gives the builder and any other trades a clear scope, which makes quotes comparable and reduces variations later.

Is an electrical design the same as a certified design?

No. A layout plan sets out where lighting, power and data go. A certified design is a separate, formal design prepared under Part 1 of AS/NZS 3000. Under regulation 59 of the Electricity (Safety) Regulations 2010, typical homes are installed to Part 2 of AS/NZS 3000 (the wiring rules), so most do not need one. If your project needs a certified design, we will tell you.

What customers say

5.0 from 47 Google reviews

Customer reviews

“Excellent company, great communication and exceptional results. Great job with the design and lovely people to work with. Highly recommend them.”

Glen M. / Design and installation / Google review

“Ryan and his team are absolutely fantastic: professional, punctual, with clear quotes and excellent communication. They offer both renovation and upgrade services for existing homes, as well as wiring and installations for new builds. I’m extremely satisfied with the upgrade they did for my home. A 5-star recommendation!”

Bo A. / Home upgrade / Google review

“Super professional guys, did a number of jobs for us, from a single power point installation to rewiring entire room and installing new lights. Ryan is down to earth and straight to the point man, absolute pleasure to deal with. Heavily recommended.”

Fyodor Y. / Power points, rewiring and lighting / Google review

Start your electrical plan

Send your floor plans and tell us about the project. We will come back with how we would approach the design and what it involves.