Commercial jobs run to a programme. Whether it is a bar or cafe fit-out, an office refresh or ongoing maintenance on a tenancy, Plexus plans the power, lighting, data and switchboard together, so trades are not waiting on each other and nothing is left to the last week.
Electrical fit-outs, maintenance, emergency lighting, data and temporary supplies for Auckland shops, offices and hospitality venues.
Pricing a commercial job?What we do for commercial clients
Fit-outs
Power, lighting, switchboards and submains for new and refurbished tenancies. We work from your designer's drawings or produce the electrical layout ourselves.
Maintenance
Planned and reactive maintenance: failed lights, tripping circuits, worn fittings and additions as the business changes.
Emergency and exit lighting
Installation, testing and replacement of emergency lighting and exit signs. See emergency lighting.
Data and communications
Structured cabling, network points and comms cabinets for point-of-sale, Wi-Fi and phones. See data and network cabling.
Temporary supplies
Temporary power for construction sites and events, set up to suit the site and the equipment that will run from it.
Test and tag
In-service inspection and testing of portable appliances and leads. See testing and certification.
Our work
Hospitality and commercial fit-outs
Fit-outs: getting the electrical right before the ceiling goes on
Hospitality and retail fit-outs are where electrical planning pays for itself. Kitchen equipment, bar fridges, coffee machines and air conditioning all need dedicated circuits, and the switchboard has to be sized for the full load, not just what is installed on day one. We confirm equipment schedules early, check the supply and the board, and agree lighting and power positions with the designer before the walls and ceilings close.
Lighting does a lot of the work in a hospitality space. We look at how the venue changes from day to evening, which areas need to be bright for staff and which should be dimmable for customers, and how it will be switched so staff are not hunting for the right switch at close.
Temporary supplies at a glance
What we need to know to set up a temporary supply.
| Question | Why it matters |
|---|---|
| What will run from it? | Tools, site sheds, lighting, pumps or event equipment set the size of the supply and the number of outlets. |
| Where is the supply coming from? | An existing switchboard, a new network connection or a generator each need a different setup. |
| How long is it needed? | A supply for a week of works is set up differently from one that runs for a full build. |
| Who will use it? | Construction site supplies have their own standard. Under regulation 25 of the Electricity (Safety) Regulations 2010, construction site installations are deemed electrically safe when they comply with and are used in line with AS/NZS 3012. |
How a commercial job runs
- STEP 01
Brief and drawings
We review the drawings, equipment list and programme, or visit site if there are none yet.
- STEP 02
Scope and price
A written quote with the scope, assumptions and anything we need from the landlord or other trades.
- STEP 03
Programme
We agree first-fix and fit-off dates with the builder or project manager and work to them.
- STEP 04
Install, test, certify
Work is tested before it is livened, and you receive the certification the work requires, ready for handover.
FAQ
Commercial electrical: common questions
Can you work from our designer's or architect's drawings?
Yes. If the electrical layout has already been drawn we price and install from it. If not, we can produce the electrical plan ourselves through our electrical design service.
Can you plan shutdowns around our trading?
Yes. Where a job needs the power off, we agree the timing with you in advance so it disrupts the business as little as possible. Tell us when the business is open when you request a quote.
Can you look after emergency lighting testing?
Yes, we install and test emergency lighting and exit signs and replace failed fittings. If your building has a compliance schedule, the inspection and reporting for it also has to be handled correctly; see emergency lighting.
Do our appliances need test and tag?
Appliances used by employees are deemed electrically safe under the Electricity (Safety) Regulations 2010 if they carry a current tag issued under AS/NZS 3760. We can set up and carry out testing. See testing and certification.
Can you run data cabling during the fit-out?
Yes. It is far easier to run data cabling at first fix than after the ceiling is finished. See data and network cabling.
What customers say
5.0 from 47 Google reviewsCustomer reviews
“Had the pleasure of working with Ryan and the team at Plexus Electrical. Great communication, high quality of work and help guide us through the process. Would definitely recommend to others.”
“I’ve worked with Plexus Electrical on multiple projects, and they consistently deliver excellent service and top-notch quality. Their communication is clear and professional, and their pricing is highly competitive. A fantastic company to work with!”
“We’ve been working with Ryan and his team at Plexus Electrical since 2016, and we can’t recommend him highly enough. Over the years, Ryan has consistently delivered exceptional service for our projects. He’s reliable, professional, and always brings a high level of expertise to every job. Whether it’s been smaller jobs or more complex work, he approaches everything with care and precision. It’s amazing having someone like Ryan as part of our trusted team. A true professional and a pleasure to work with!”
Pricing a commercial job?
Send the drawings or a description of the site, the programme if there is one, and we will come back to you.
More on commercial electrical