If you have off-street parking, home is usually the cheapest and most convenient place to charge an EV, typically overnight. You can charge slowly from a normal socket using the portable cable that came with the car, or faster from a wall-mounted charger on its own circuit. A typical single-phase wall charger delivers about 7 kW; three-phase chargers can deliver 11 or 22 kW, but only if your house has a three-phase supply and your car can accept that much. This guide explains the options, what actually limits charging speed, how smart and off-peak charging work, and what an electrician checks before installing a charger. If you want to know what an installation costs, see our separate EV charger installation cost guide.
The short version
- A normal socket works for light use but is slow, and EECA says the portable cable is not designed to be your main way of charging at home.
- A 7 kW wall charger on a dedicated circuit suits most homes and most daily driving.
- 11 kW or 22 kW needs a three-phase supply and a car whose onboard charger can use it.
- Your car's onboard charger often sets the real limit, whatever the wall charger is rated at.
- Smart charging lets you charge at off-peak rates and stop the charger overloading your supply.
EECA says charging at home costs the equivalent of about $1.60 a litre to "fill up", including road user charges (EECA), which is why getting home charging right matters.
Option 1: charging from a normal socket
Most EVs come with a portable charging cable with a control box partway along it and a standard 3-pin plug. You plug it into a socket and the car charges slowly.
How slowly? A standard NZ socket is rated at 10 A, which at 230 V is about 2.3 kW at most. In practice WorkSafe's EV charging guidelines say a portable charging cable on a 10 A plug must either limit itself to 8 A, or limit itself to 10 A and monitor the temperature of the plug pins. EECA puts standard 3-pin charging at "up to 1.8 kW". Consumer NZ estimates that overnight on a socket you will add only about 16 to 18 kWh.
That can be enough if you drive a short commute and can plug in every night. It is rarely enough for a bigger battery or a long daily drive. EECA's view is that the portable cable is "not designed to be used as the primary means of home charging."
If you do charge from a socket:
- plug the cable directly into the wall socket, never into an extension lead, multi-box, double adaptor or travel plug;
- only use equipment designed for New Zealand's 230 V supply;
- do not run the cable across a footpath;
- stop using any cable or plug that is damaged, discoloured or gets hot, and get the socket checked.
WorkSafe's guidelines also say charging from a socket at home should only be done where the supply is protected by an RCD. If you are not sure whether your sockets are RCD protected, our guide to RCD protection explains how to check.
Option 2: a dedicated wall charger
A wall charger (sometimes called a wallbox or EVSE) is fixed to a wall or post and supplied from its own circuit at the switchboard. EECA advises that an electrician should install a separate sub-circuit, use a cable that can supply the unit's full power (a 32 A circuit "will futureproof the installation"), fit a Type B RCD and confirm the charger has a Supplier Declaration of Conformity.
The figures you will see on charger spec sheets come from simple arithmetic:
| Supply | Typical charger current | Approximate power |
|---|---|---|
| Single phase | 32 A | about 7 kW (7.4 kW at 230 V) |
| Three phase | 16 A per phase | about 11 kW |
| Three phase | 32 A per phase | about 22 kW |
Most houses have a single-phase supply, so about 7 kW is the practical ceiling for most home chargers. Consumer NZ notes three-phase charging is unnecessary unless you already have three-phase power at home.
What really limits your charging speed
The car charges at the speed of the slowest link in the chain. There are usually four links.
1. The car's onboard charger
When you charge from a home charger, you are supplying AC power. The car converts it to DC for the battery using its own onboard charger, and that charger has a maximum rate. Consumer NZ gives the example of an older Nissan Leaf that "will only accept 3.6kW AC, so that's all you'll get", even from a 7 kW charger. Many cars accept 7 kW or 11 kW on AC. Check your car's maximum AC charging rate in its specifications before choosing a charger. There is no point paying for 22 kW if the car can only take 7 kW or 11 kW.
2. The charger and its settings
A charger can be set below its maximum, either at installation to suit the circuit, or by its smart features. A charger rated at 7 kW might be set to 5 kW if that is what the circuit or supply allows.
3. The circuit and switchboard
The charger needs its own circuit, sized for the current it will draw, with the right protection. That needs space on the switchboard. An older board with fuses, no RCDs or no spare room may need work first; see signs you need a switchboard upgrade.
4. Your supply
Your house has a maximum it can draw from the network. A 7 kW charger running at the same time as a heat pump, oven, hot water cylinder and dryer can push a house close to that limit. Vector notes homes adding high-consumption equipment, such as EV chargers, may need a capacity upgrade. A load-balancing smart charger is often the cheaper answer, because it reduces the charging power when the rest of the house is busy.
Many cars also slow the charge as the battery gets close to full, so the last part of a charge takes longer than the rest.
How long will it take?
A useful rule of thumb is: hours of charging = energy needed (kWh) ÷ charging power (kW).
For example, topping a battery up by 36 kWh takes:
- about 16 hours at 2.3 kW (a socket, at best);
- about 10 hours at 3.6 kW (a car limited to 3.6 kW);
- about 5 hours at 7 kW (a typical single-phase charger).
These figures ignore charging losses, so real times are a little longer. Most people do not charge from empty every night. They top up what they used that day, which is often well within a single off-peak window on a 7 kW charger.
To run the numbers for your own car, distance and electricity price, try our EV charging time and cost calculator.
Smart charging and off-peak plans
A smart charger connects to an app or your Wi-Fi and lets you control when and how fast the car charges. EECA says smart chargers can be at least three times faster than a 3-pin plug and that scheduling charging for off-peak rates can "save more than 20% of your charging costs". EECA also notes that some retailers and lines companies offer off-peak power that is "around 40% cheaper than standard rates". EECA keeps an approved list of residential smart chargers on its smart EV chargers page.
The features worth asking about:
- Scheduling: start charging when your off-peak rate begins.
- Load balancing: EECA says smart chargers can power down "automatically when your household is using lots of power at once." This needs a sensor at the switchboard.
- Solar matching: if you have solar panels, some chargers can use surplus solar first.
- Override: a boost button for the day you need a full charge now.
A standard wall charger without smart features still works well. You can usually set the car itself to start charging at a set time.
What an electrician checks before installing a charger
A good site visit covers:
- Your car (or next car). Its maximum AC charging rate and where the charge port is.
- Your supply. Single phase or three phase, and how much capacity is left once your heat pumps, cooking and hot water are counted.
- The switchboard. Space for a new circuit, the right protection, and whether the board itself is due for an upgrade.
- Protection. WorkSafe's guidelines call for a dedicated final sub-circuit in homes, RCD protection that copes with DC fault current (which is why EECA specifies a Type B RCD), and a lockable isolator that disconnects all live conductors, including the neutral.
- Location. Where you park, the cable route from the board, whether the charger will be outdoors, and keeping the cable clear of walkways. WorkSafe's guidelines say a charger's socket-outlet should be at least 800 mm above the ground.
- Testing and certification. EECA advises that you should receive a certificate of compliance, including an electrical safety certificate. Our guide to electrical certificates explains what these are.
Wall chargers must be installed by a licensed electrician. This is not homeowner work.
Next steps
If you are thinking about home charging, start with your car's AC charging rate and how far you drive each day, then decide whether a socket will do or a wall charger makes sense. Plexus installs EV chargers across Auckland and can handle any switchboard upgrade in the same job. Because we also install heat pumps, we can plan the charger around your heating load. Request a quote with a photo of your switchboard and where you park.
Sources
- EECA: Charging your EV at home and on the road
- EECA: Smart EV chargers
- EECA: Residential smart EV charging and demand flexibility
- WorkSafe Energy Safety: Electric vehicle charging safety guidelines, 2nd edition (May 2019)
- Consumer NZ: What you need to know about charging an electric car
- Vector: Capacity upgrade or downgrade
This guide is general information for New Zealand homes, not advice for your specific property. For a recommendation that accounts for your house, ask us.